Meldrim
Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
SAVproject sponsor
2projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| SAV: CC - BIG OGEECHEE 500/230kV (NETWORK IMPROVEMENTS) Construct a new substation near Little Ogeechee, adjacent to the 500kV and 230kV McCall Road - Thalmann 500kV and the Little Ogeechee - Meldrim 230kV Black and White lines. The new substation will loop in the existing McCall Road - Thalmann 500kV line, the existing Little Ogeechee - Meldrim 230kV lines, and accommodate a new 500/230kV auto transformer with an additional 230kV connection to Little Ogeechee. TEAMS 19966 · plan p.105 · zone 219 |
SAV | In the plan p.8 |
Jun 1, 2026 | No change | Big Ogeechee, Little Ogeechee, McCall Road, Meldrim, Thalmann |
| SAV: COLEMAN - MELDRIM 115kV LINE RECONDUCTOR Rebuild the Coleman - Meldrim 115kV line from Four Lakes - Structure 76A, approximately 8.1 miles, using 200C 1351 ACSS Martin. Upgrade two switches at Quacco Rd to a higher rating. TEAMS 20784 · plan p.220 · zone 219 |
SAV | In the plan p.17 |
Jun 1, 2029 | Advanced from 2032 to 2029 | Coleman, Meldrim |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.
Site Scanner