Home / Southern Company / Counties / Chatham, GA
Chatham, GA interconnection queue
1 active project
totaling 30 MW in the Southern Company queue, plus 6 with terminal status (shown grayed).
1 active projects
30 active MW
7 total filed
Queue ID Project kV MW Resource Status
IC-051
Not reported
115
800
Gas
Withdrawn
IC-093
Not reported
230
640
Gas
Withdrawn
IC-052
Not reported
115
613
Gas
Withdrawn
IC-119
Not reported
230
550
Gas
Withdrawn
IC-099
Not reported
230
533
Gas
Withdrawn
IC-1155
Not reported
46
50
Battery
Withdrawn
IC-233
Weyerhaeuser Port Wentworth
n/r
30
Gas
Operational
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Southern Company before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.