Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035), in Fayette County.

Fayettecounty
500, 230kV in the quote
GPCproject sponsor
1projects in the plan

Described as new. The quoted wording calls this substation new. “new 500/230kV substation (Ashley Park)” — TEAMS 20018, plan p.84

County: “connecting the Ashley Park Substation in Fayette County to Plant Wansley in Heard County” — Georgia Power, Ashley Park–Wansley 500kV Transmission Project page, retrieved 2026-11-20. The plan itself prints no county column.

Location

33.5131, -84.4898 · Fayette County, GA · view on a map

Point published by the utility. The utility publishes this point, on a project map or in a filing. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Printed by the sponsor: Georgia Power's Ashley Park–Wansley project page embeds its project map's configuration, with a location titled "Ashley Park Substation" at position lat 33.5131375, lng -84.4897599; the proposed 500 kV line's printed path starts ~150 m from it (33.514295, -84.488912). Web-map marker, not a survey point: the page says "MAP NOT BASED ON FIELD SURVEY DATA" and "Structure and Line Locations based on Pre-Engineering data and subject to change". Accuracy ±300 m is a station-footprint allowance around a marker, not a survey figure.

Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.84 · Georgia Power, Ashley Park–Wansley 500kV Transmission Project page (n/a (retrieved 2026-11-20)), About the Project; Project Map. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
CC - FAYETTEVILLE AREA TRANSMISSION NEEDS
Build a new 500/230kV substation (Ashley Park) splitting the Ohara - Union City 500kV line. Install two 500/230kV auto transformers at the Ashley Park station. Build two new 230kV lines (6 miles each) from Ashley Park to the high side of the customer substations. The new lines will be built with bundled 200C 1351 ACSS Martin conductor.
TEAMS 20018 · plan p.84 · zone 208
GPC In the plan
p.7
Apr 1, 2026 No change Ashley Park, Ohara, Union City

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first