Kemper Bluff

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Victoria County. First named in the release with data as of July 13, 2026.

Victoriacounty as printed
138kV
STECutility
1projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Victoria, TX: ERCOT queue, 17 active of 22. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
STEC Ammonia Plant Load Project Phase 1
Construct Kemper Bluff substation to serve large load and connect to AEP’s 138-kV Dupont Switching station via a 138-kV transmission line, with normal and emergency ratings of at least 427 MVA and 478 MVA, respectively, which will require a new right of way (ROW), approximately 3.4-mile
ERCOT project 110445 · RPG 25RPG012
STEC
Tier 1
Conceptual
Current-year planned tab
138 Jan 2027 Kemper Bluff to Dupont
Victoria County
Kemper Bluff, Dupont

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110445First listedon the Current-year planned tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.