Dupont

Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Victoria County, plus 1 on its Cancelled tab. First named in the release with data as of May 12, 2023.

Victoriacounty as printed
138kV
AEP TCC, STECutility
4projects listed

Also printed as: Dupont Switch

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Victoria, TX: ERCOT queue, 17 active of 22. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
STEC Ammonia Plant Load Project Phase 1
Construct Kemper Bluff substation to serve large load and connect to AEP’s 138-kV Dupont Switching station via a 138-kV transmission line, with normal and emergency ratings of at least 427 MVA and 478 MVA, respectively, which will require a new right of way (ROW), approximately 3.4-mile
ERCOT project 110445 · RPG 25RPG012
STEC
Tier 1
Conceptual
Current-year planned tab
138 Jan 2027 Kemper Bluff to Dupont
Victoria County
Kemper Bluff, Dupont
STEC Ammonia Plant Load Phase 2
-Rebuild the existing Victoria Plant to Shepley to Dupont 138-kV transmission line with normal and emergency ratings of at least 485 MVA, approximately 7.66-mile; -Rebuild the existing Victoria Plant to Dupont 138-kV transmission line ckt2 with normal and emergency ratings of at least 485 MVA, approximately 7.66-mile; -Remove the double-circuit section of the Victoria Plant to Shepley and Victoria…
ERCOT project 110447 · RPG 25RPG012
STEC
Tier 1
Conceptual
Future tab
138 Jan 2028 Victoria to Dupont
Victoria County
Victoria, Dupont
STEC Ammonia Plant Load Project Phase 3
-Rebuild the existing Formosa to Joslin 138-kV transmission line with normal and emergency ratings of at least 485 MVA, approximately 2.41-mile -Rebuild the existing Tungsten to Vistron to Black Bayou to Big Three to Dupont 138-kV transmission line with normal and emergency ratings of at least 485 MVA, approximately 21.11-mile.
ERCOT project 110449 · RPG 25RPG012
STEC
Tier 1
Conceptual
Future tab
138 Jan 2029 Formosa,Tungsten to Joslin,Dupont
Victoria County
Formosa, Tungsten, Joslin, Dupont
Dupont Switch to Joslin: Rebuild 138 kV Line
Rehab the Dupont Switch to Joslin 138 kV Line
ERCOT project 73441 · RPG 22RPG040
AEP TCC
Tier 4
Planned
Future tab
138 Feb 2028 Dupont to Joslin
Victoria / Calhoun County
Dupont, Joslin

On the Cancelled tab

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Dupont Switch to Sardinia: Construct New 138 kV Line
Interconnect the Epsilon load to the new Sardinia 138 kV station out of the existing Dupont Switch 138 kV station
ERCOT project 81647
AEP TCC
Tier 4
Conceptual
Cancelled tab
138 Jun 2026 Dupont Switch to Sardinia
Victoria County
Dupont Switch, Sardinia

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110445First listedon the Current-year planned tab
July 13, 2026110447First listedon the Future tab
July 13, 2026110449First listedon the Future tab
February 1, 202673441Projected in-service dateOct 2027 → Feb 2028
June 1, 202573441Projected in-service dateMay 2027 → Oct 2027
June 1, 202581647Moved between tabsFuture → Cancelled
February 1, 202573441Projected in-service dateDec 2026 → May 2027
June 1, 202473441Projected in-service dateDec 2025 → Dec 2026
June 1, 202481647First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.