Dupont
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Victoria County, plus 1 on its Cancelled tab. First named in the release with data as of May 12, 2023.
Also printed as: Dupont Switch
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Victoria, TX: ERCOT queue, 17 active of 22. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| STEC Ammonia Plant Load Project Phase 1 Construct Kemper Bluff substation to serve large load and connect to AEP’s 138-kV Dupont Switching station via a 138-kV transmission line, with normal and emergency ratings of at least 427 MVA and 478 MVA, respectively, which will require a new right of way (ROW), approximately 3.4-mile ERCOT project 110445 · RPG 25RPG012 |
STEC Tier 1 |
Conceptual Current-year planned tab |
138 | Jan 2027 | Kemper Bluff to Dupont Victoria County |
Kemper Bluff, Dupont |
| STEC Ammonia Plant Load Phase 2 -Rebuild the existing Victoria Plant to Shepley to Dupont 138-kV transmission line with normal and emergency ratings of at least 485 MVA, approximately 7.66-mile; -Rebuild the existing Victoria Plant to Dupont 138-kV transmission line ckt2 with normal and emergency ratings of at least 485 MVA, approximately 7.66-mile; -Remove the double-circuit section of the Victoria Plant to Shepley and Victoria… ERCOT project 110447 · RPG 25RPG012 |
STEC Tier 1 |
Conceptual Future tab |
138 | Jan 2028 | Victoria to Dupont Victoria County |
Victoria, Dupont |
| STEC Ammonia Plant Load Project Phase 3 -Rebuild the existing Formosa to Joslin 138-kV transmission line with normal and emergency ratings of at least 485 MVA, approximately 2.41-mile -Rebuild the existing Tungsten to Vistron to Black Bayou to Big Three to Dupont 138-kV transmission line with normal and emergency ratings of at least 485 MVA, approximately 21.11-mile. ERCOT project 110449 · RPG 25RPG012 |
STEC Tier 1 |
Conceptual Future tab |
138 | Jan 2029 | Formosa,Tungsten to Joslin,Dupont Victoria County |
Formosa, Tungsten, Joslin, Dupont |
| Dupont Switch to Joslin: Rebuild 138 kV Line Rehab the Dupont Switch to Joslin 138 kV Line ERCOT project 73441 · RPG 22RPG040 |
AEP TCC Tier 4 |
Planned Future tab |
138 | Feb 2028 | Dupont to Joslin Victoria / Calhoun County |
Dupont, Joslin |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Dupont Switch to Sardinia: Construct New 138 kV Line Interconnect the Epsilon load to the new Sardinia 138 kV station out of the existing Dupont Switch 138 kV station ERCOT project 81647 |
AEP TCC Tier 4 |
Conceptual Cancelled tab |
138 | Jun 2026 | Dupont Switch to Sardinia Victoria County |
Dupont Switch, Sardinia |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110445 | First listed | on the Current-year planned tab |
| July 13, 2026 | 110447 | First listed | on the Future tab |
| July 13, 2026 | 110449 | First listed | on the Future tab |
| February 1, 2026 | 73441 | Projected in-service date | Oct 2027 → Feb 2028 |
| June 1, 2025 | 73441 | Projected in-service date | May 2027 → Oct 2027 |
| June 1, 2025 | 81647 | Moved between tabs | Future → Cancelled |
| February 1, 2025 | 73441 | Projected in-service date | Dec 2026 → May 2027 |
| June 1, 2024 | 73441 | Projected in-service date | Dec 2025 → Dec 2026 |
| June 1, 2024 | 81647 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.