Mcneil
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Travis County. First named in the release with data as of February 1, 2015.
Also printed as: McNeil · McNeil Substation
A HIFLD substation record has the same name and county: MCNEIL (TRAVIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Travis, TX: ERCOT queue, 8 active of 8. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| HarrisBranch_McNeil_Transmission_Line_Upgrade LCRA TSC will upgrade T146 Harris Branch - McNeil 138-kV transmission line to achieve a higher operational rating. ERCOT project 100178 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2028 | Harris Branch to Mcneil Travis County |
Harris Branch, Mcneil |
| Gilleland Creek - McNeil Transmission line Upgrade Upgrade L_MCNEIL8_1Y (Bus #7334) - L_GILLCR8_1Y (Bus #7336) 138.0-kV line as an LCP project for Batch Zero Base Load ERCOT project 109914 |
LCRATSC Tier 4 |
Conceptual Future tab |
138 | Dec 2030 | Gilleland Creek to McNeil Travis County |
Gilleland Creek, McNeil |
| McNeil to MagPlant Ckt 977 Upgrade Reconductor existing McNeil to MagPlant circuit from 2000 to 3000 Amp. Relocate McNeil to Summit Circuit 907 and McNeil to MagPlant Circuit 977 to separate structures. Kramer Lane (KA) substation will be cut-into this line in 2023 ERCOT project 16TPIT0007 · utility no. P396 |
AEN Tier 4 |
Planned Future tab |
138 | Jun 2030 | McNeil Substation to Mag Plant Substation Travis County |
McNeil Substation, Mag Plant Substation |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109914 | First listed | on the Future tab |
| October 1, 2025 | 100178 | First listed | on the Future tab |
| June 1, 2025 | 16TPIT0007 | Projected in-service date | Jun 2025 → Jun 2030 |
| October 1, 2024 | 16TPIT0007 | Moved between tabs | Completed → Future |
| October 1, 2024 | 16TPIT0007 | Projected in-service date | Jun 2024 → Jun 2025 |
| June 1, 2024 | 16TPIT0007 | Moved between tabs | Future → Completed |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.