Mcneil

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Travis County. First named in the release with data as of February 1, 2015.

Traviscounty as printed
138kV
AEN, LCRATSCutility
3projects listed

Also printed as: McNeil · McNeil Substation

A HIFLD substation record has the same name and county: MCNEIL (TRAVIS County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Travis, TX: ERCOT queue, 8 active of 8. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
HarrisBranch_McNeil_Transmission_Line_Upgrade
LCRA TSC will upgrade T146 Harris Branch - McNeil 138-kV transmission line to achieve a higher operational rating.
ERCOT project 100178
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 Harris Branch to Mcneil
Travis County
Harris Branch, Mcneil
Gilleland Creek - McNeil Transmission line Upgrade
Upgrade L_MCNEIL8_1Y (Bus #7334) - L_GILLCR8_1Y (Bus #7336) 138.0-kV line as an LCP project for Batch Zero Base Load
ERCOT project 109914
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2030 Gilleland Creek to McNeil
Travis County
Gilleland Creek, McNeil
McNeil to MagPlant Ckt 977 Upgrade
Reconductor existing McNeil to MagPlant circuit from 2000 to 3000 Amp. Relocate McNeil to Summit Circuit 907 and McNeil to MagPlant Circuit 977 to separate structures. Kramer Lane (KA) substation will be cut-into this line in 2023
ERCOT project 16TPIT0007 · utility no. P396
AEN
Tier 4
Planned
Future tab
138 Jun 2030 McNeil Substation to Mag Plant Substation
Travis County
McNeil Substation, Mag Plant Substation

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109914First listedon the Future tab
October 1, 2025100178First listedon the Future tab
June 1, 202516TPIT0007Projected in-service dateJun 2025 → Jun 2030
October 1, 202416TPIT0007Moved between tabsCompleted → Future
October 1, 202416TPIT0007Projected in-service dateJun 2024 → Jun 2025
June 1, 202416TPIT0007Moved between tabsFuture → Completed

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.