Lago Vista
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Travis County. First named in the release with data as of February 1, 2015.
A HIFLD substation record has the same name and county: LAGO VISTA (TRAVIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Travis, TX: ERCOT queue, 8 active of 8. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| LCRATSC Lago Vista Substation Upgrade LCRA TSC will improve reliability at the Lago Vista substation by replacing obsolete oil circuit breakers and its adjacent switches and making other improvements. ERCOT project 103308 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2028 | Lago Vista Travis County |
Lago Vista |
| Lago Vista to Nameless Transmission Line Upgrade Rebuild and upgrade Nameless to Lago Vista with double-circuit capable structures. Install 1 ckt with bundled 795 kcmil conductor (440 MVA). Final span of conductor and terminal equipment at Nameless will be upgraded to 440 MVA with ERCOT project #72576B. (Replaces ERCOT Project # 61277A) ERCOT project 72576A |
PEC Tier 4 |
Planned Completed tab |
138 | Apr 2025 actual 2025-04 |
Lago Vista to Nameless Travis County |
Lago Vista, Nameless |
| Lago Vista to Nameless Transmission Line Upgrade Upgrade final span into Nameless, upgrade terminal equipment, and achieve circuit rating of 440 MVA. (Replaces ERCOT Project #61277B) ERCOT project 72576B |
PEC Tier 4 |
Planned Current-year planned tab |
138 | Jul 2026 | Lago Vista to Nameless Travis County |
Lago Vista, Nameless |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 103308 | Projected in-service date | May 2027 → May 2028 |
| July 13, 2026 | 72576B | Projected in-service date | May 2026 → Jul 2026 |
| June 1, 2026 | 103308 | First listed | on the Future tab |
| February 1, 2026 | 72576B | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 72576A | Moved between tabs | Future → Completed |
| October 1, 2024 | 72576B | Projected in-service date | Jan 2026 → May 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.