McKenzie Road
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Nueces County. First named in the release with data as of February 1, 2019.
Nuecescounty as printed
138kV
AEP TCC/ETTutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Nueces, TX: ERCOT queue, 13 active of 13. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| McKenzie to Westside: Reconductor 138 kV Line Reconductor the McKenzie to Westside 138 kV line ERCOT project 86882 · utility no. TP2024025 |
AEP TCC/ETT Tier 4 |
Planned Current-year planned tab |
138 | Nov 2026 | McKenzie Road to Westside Nueces County |
McKenzie Road, Westside |
| McKenzie Road to Winthorp: Construct New 138 kV Line Interconnect the new Winthorp load station to the existing McKenzie Road 138 kV station ERCOT project 90038 · utility no. TP2024150 |
AEP TCC/ETT Tier 4 |
Planned Current-year planned tab |
138 | Oct 2026 | McKenzie Road to Winthorp Nueces County |
McKenzie Road, Winthorp |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2026 | 86882 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 90038 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 90038 | Projected in-service date | Aug 2026 → Oct 2026 |
| February 1, 2025 | 90038 | First listed | on the Future tab |
| October 1, 2024 | 86882 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.