Substation Scout

Roscoe

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Nolan County. First named in the release with data as of October 1, 2025.

Nolancounty as printed
345kV
ONCORutility
1projects listed

Described as new. The quoted wording calls this substation new. “new Roscoe 345/138-kV substation” — project 99353 description, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Nolan, TX: ERCOT queue, 18 active of 18. Same county, not the same substation.

Location

32.4142, -100.5248 · Nolan County, TX · view on a map

Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Symbol anchored: the red 'Project End Points' dot labelled 'Planned Oak Spring Switch' on Oncor / Freese and Nichols 'Environmental and Land Use Constraints Map, Plowboy Substation - Oak Spring Switch 138 kV Transmission Line Project' (aerial basemap, marked PRELIMINARY 1/8/2026). Read at 100 dpi: the dot is ~1,375 px (2.23 km at the map's 1-mile bar, ~990 px/mile) south along FM 608 from the IH 20 / FM 608 crossing (OSM 32.4344,-100.5348) and ~285 px (0.46 km) east of FM 608, giving 32.4157,-100.5248. Oncor prints the switch 'approximately 1.52 miles south-southeast of the intersection of IH 20 and FM 608' (32.4140,-100.5248 by that bearing). The map draws the dot ~95 m north of the 'Oncor Existing 138 kV' line; OSM's (coarse) 138 kV and 345 kV line ways cross FM 608 ~2.65 km south of IH 20, which puts the dot near 32.413. Point is the middle of those three reads, +/- ~300 m.

Note: Renamed: TPIT's title says Oak Spring was formerly known as Roscoe and Plowboy; Oncor's public materials call it the Oak Spring Switch, and Plowboy is the name of Oncor's existing substation at the other end of the new 138 kV line. The map is marked preliminary (January 2026); the CCN application (PUCT Docket 60008) followed in July 2026.

Sources: Oncor, Environmental and Land Use Constraints Map, Plowboy Substation - Oak Spring Switch 138 kV Transmission Line Project, Nolan County (preliminary) (2026-01-08), p.1 · Oncor, Plowboy to Oak Spring 138 kV Transmission Line Project page (CCN application filed July 30, 2026, PUCT Docket 60008) (2026) · ERCOT TPIT, project 99353 (release 39, 2026-10-01) · OpenStreetMap: IH 20, FM 608, 138 kV and 345 kV lines south of Roscoe (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Oak Spring (fka Roscoe, Plowboy) 345/138 kV Switch
Add Permian Basin Reliability Plan Upgrade ID L25A and L25B. Establish a new Roscoe 345/138-kV substation near the Sweetwater Tap (1341) and install two new 345/138-kV transformers. Loop the existing Sweetwater East - Champion Creek/Bitter Creek - Cattleman 345-kV double-circuit line into Roscoe.
ERCOT project 99353 · utility no. R8613
ONCOR
Tier 3
Planned
Future tab
345 May 2027 No terminals printed
Nolan County
Roscoe, Bitter Creek, Cattleman

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202599353First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first