Spraberry
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Midland County. First named in the release with data as of February 1, 2015.
Midlandcounty as printed
138kV
ONCORutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Midland, TX: ERCOT queue, 7 active of 8 · SPP queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Stanton East - Midland Basin - Spraberry 69 kV Line Conversion to 138 kV Adds part of Permian Basin Reliability Plan Upgrade ID L18. Convert the existing Stanton East - Midland Basin - Spraberry 69-kV line to 138-kV and cut into Consavvy 138 kV Switch to establish the Spraberry - Consavvy 138 kV Line. ERCOT project 99391A · utility no. PB_L18_A |
ONCOR Tier 3 |
Planned Current-year planned tab |
138 | Dec 2026 | Spraberry to Consavvy Midland County |
Spraberry, Consavvy |
| Stanton East - Midland Basin - Spraberry 69 kV Line Conversion to 138 kV Add part of Permian Basin Reliability Plan Upgrade ID L18. Decommissions Midland Basin, Midland Gulf, Spraberry, Martin, and Stanton East 69 kV Stations. ERCOT project 99391B · utility no. PB_L18_A |
ONCOR Tier 3 |
Planned Future tab |
138 | Mar 2027 | Spraberry to Stanton East Midland County |
Spraberry, Stanton East |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2026 | 99391A | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 99391A | First listed | on the Future tab |
| October 1, 2025 | 99391B | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.