Welfare
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Kendall County. First named in the release with data as of June 1, 2021.
A HIFLD substation record has the same name and county: WELFARE (KENDALL County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Kendall, TX: ERCOT queue, 1 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Boerne - Welfare Transmission Line Upgrade Upgrade the 9.5-mile Boerne - Welfare 138-kV circuit to achieve a minimum 539 MVA emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load ERCOT project 110144 |
LCRATSC Tier 4 |
Conceptual Future tab |
138 | Dec 2030 | Boerne to Welfare Kendall County |
Boerne, Welfare |
| Boerne Split-Welfare Transmission Line Upgrade This project will Increase the reliability of transmission facilities on the T228 Boerne to Welfare 138-kV and T656 Bergheim to Kendall 345-kV 7.3-mile double-circuit transmission line by replacing the aging conductor. ERCOT project 61404 · RPG 22RPG005 |
LCRATSC Tier 3 |
Planned Completed tab |
345 | Mar 2026 actual 2026-03 |
Boerne, Bergheim to Welfare, Kendall Kendall County |
Boerne, Bergheim, Welfare, Kendall |
| Kendall - Welfare Transmission Line Upgrade This project will Increase the reliability of transmission facilities on the T584 Kendall to Welfare 138-kV and T656 Bergheim to Kendall 345-kV 10.2-mile double-circuit transmission line by replacing the aging conductor. ERCOT project 61406 · RPG 22RPG005 |
LCRATSC Tier 3 |
Planned Future tab |
138 | Jan 2027 | Kendall to Welfare Kendall County |
Kendall, Welfare |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110144 | First listed | on the Future tab |
| July 13, 2026 | 61404 | Moved between tabs | Current-year planned → Completed |
| July 13, 2026 | 61404 | Projected in-service date | Jun 2026 → Mar 2026 |
| July 13, 2026 | 61406 | Moved between tabs | Current-year planned → Future |
| July 13, 2026 | 61406 | Projected in-service date | Dec 2026 → Jan 2027 |
| February 1, 2026 | 61404 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 61404 | Projected in-service date | Jan 2026 → Jun 2026 |
| February 1, 2026 | 61406 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 61406 | Projected in-service date | Jun 2027 → Dec 2026 |
| February 1, 2025 | 61404 | Projected in-service date | Nov 2025 → Jan 2026 |
| February 1, 2025 | 61406 | Projected in-service date | Nov 2025 → Jun 2027 |
| October 1, 2024 | 61404 | Projected in-service date | Apr 2025 → Nov 2025 |
| October 1, 2024 | 61406 | Projected in-service date | Aug 2025 → Nov 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.