Kendall, TX interconnection queue

1 active project totalling 100.6 MW in the ERCOT queue.

1active projects
100.6active MW
1total filed
Queue IDProjectkVMWResourceStatus
23INR0163 Ringtail Ridge Storage 138 100.6 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.