Substation Scout

Boerne

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Kendall County. First named in the release with data as of February 1, 2016.

Kendallcounty as printed
138, 345kV
LCRATSCutility
3projects listed

A HIFLD substation record has the same name and county: BOERNE (KENDALL County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Kendall, TX: ERCOT queue, 1 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Boerne - Welfare Transmission Line Upgrade
Upgrade the 9.5-mile Boerne - Welfare 138-kV circuit to achieve a minimum 539 MVA emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load
ERCOT project 110144
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2030 Boerne to Welfare
Kendall County
Boerne, Welfare
Boerne Bus Substation Upgrade
Upgrade terminal equipment at the Boerne Substation to achieve a minimum 584 MVA emergency rating on the 3.9-mile Boerne - Esparanza 138-kV circuit. This is an LCP Upgrade project to support Batch Zero Base Load.
ERCOT project 110158
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2030 Boerne
Kendall County
Boerne
Boerne Split-Welfare Transmission Line Upgrade
This project will Increase the reliability of transmission facilities on the T228 Boerne to Welfare 138-kV and T656 Bergheim to Kendall 345-kV 7.3-mile double-circuit transmission line by replacing the aging conductor.
ERCOT project 61404 · RPG 22RPG005
LCRATSC
Tier 3
Planned
Completed tab
345 Mar 2026
actual 2026-03
Boerne, Bergheim to Welfare, Kendall
Kendall County
Boerne, Bergheim, Welfare, Kendall

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110144First listedon the Future tab
July 13, 2026110158First listedon the Future tab
July 13, 202661404Moved between tabsCurrent-year planned → Completed
July 13, 202661404Projected in-service dateJun 2026 → Mar 2026
February 1, 202661404Moved between tabsFuture → Current-year planned
February 1, 202661404Projected in-service dateJan 2026 → Jun 2026
February 1, 202561404Projected in-service dateNov 2025 → Jan 2026
October 1, 202461404Projected in-service dateApr 2025 → Nov 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first