Named in 7 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of October 1, 2020.

Harriscounty as printed
138kV
CNPutility
7projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Prairieland 138/35kV Distribution Substation
Install Prairieland (PRL) 138/35kV Distribution Substation. Loop on Ckt.66B Hockley to Stone Lake to create new Ckt.66B Hockley to Prairieland to Stone Lake.
ERCOT project 102777
CNP
Tier 4
Planned
Future tab
138 May 2027 Prairieland to Hockley/Stone Lake
Harris County
Prairieland, Hockley, Stone Lake
Ckt.66B Stone Lake to Hockley Hardening and Waller Cap Bank
Upgrade Ckt.66B Hockley to (Prairieland) to Stone Lake to increase thermal limits (Hockley equipment upgrade)
ERCOT project 104643A
CNP
Tier 4
Planned
Future tab
138 May 2027 Stone Lake to Hockley
Harris County
Stone Lake, Hockley
Ckt.66B Stone Lake to Hockley Hardening and Waller Cap Bank
Rebuild and reconductor Ckt.66B Hockley to (Prairieland) to Stone Lake as a Hardening upgrade.
ERCOT project 104643C
CNP
Tier 4
Planned
Future tab
138 May 2027 Stone Lake to Hockley
Harris County
Stone Lake, Hockley
Ckt.66B Stone Lake to Hockley Hardening and Waller Cap Bank
Rebuild and reconductor Ckt.66B Hockley to (Prairieland) to Stone Lake as a Hardening upgrade.
ERCOT project 104643D
CNP
Tier 4
Planned
Future tab
138 May 2027 Stone Lake to Hockley
Harris County
Stone Lake, Hockley
Upgrade Ckt.66B Stone Lake to Tomball to increase thermal limits. Install 40 MVAR cap bank at Hockley substation and tapped on Ckt.66B Hockley to Stone Lake.
Partial reconductor Ckt.66B Stone Lake to Tomball. Phase One of overall approved upgrades
ERCOT project 75835A · RPG 23RPG012
CNP
Tier 3
In-Service
Completed tab
138 Aug 2025
actual 2025-07
Stone Lake to Tomball
Harris County
Stone Lake, Tomball
Upgrade Ckt.66B Stone Lake to Tomball to increase thermal limits. Install 40 MVAR cap bank at Hockley substation and tapped on Ckt.66B Hockley to Stone Lake.
Upgrade Ckt.66B Stone Lake to Tomball to increase thermal limits. Phase Three of overall approved upgrades.
ERCOT project 75835C · RPG 23RPG012
CNP
Tier 3
Planned
Future tab
138 May 2027 Stone Lake to Tomball
Harris County
Stone Lake, Tomball
Upgrade Ckt.66B Stone Lake to Tomball to increase thermal limits. Install 40 MVAR cap bank at Hockley substation and tapped on Ckt.66B Hockley to Stone Lake.
Upgrade equipment to increase thermal limits. Phase Two of overall approved upgrades
ERCOT project 75835D · RPG 23RPG012
CNP
Tier 3
In-Service
Completed tab
138 May 2026
actual 2025-12
Stone Lake to Tomball
Harris County
Stone Lake, Tomball

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
June 1, 2026104643AFirst listedon the Future tab
June 1, 2026104643CFirst listedon the Future tab
June 1, 2026104643DFirst listedon the Future tab
June 1, 202675835DMoved between tabsCurrent-year planned → Completed
February 1, 2026102777First listedon the Future tab
February 1, 202675835AProjected in-service dateJul 2025 → Aug 2025
February 1, 202675835DMoved between tabsFuture → Current-year planned
February 1, 202675835DStatus as reportedPlanned → In-Service
October 1, 202575835AMoved between tabsCurrent-year planned → Completed
October 1, 202575835AStatus as reportedPlanned → In-Service
October 1, 202575835AProjected in-service dateMay 2025 → Jul 2025
October 1, 202575835DFirst listedon the Future tab
June 1, 202575835AMoved between tabsFuture → Current-year planned
February 1, 202575835AProjected in-service dateOct 2026 → May 2025
February 1, 202575835CFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.