Kirby
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2021.
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Heights 138kV Loop Conversion Tap existing Ckt.90A Kirby to Garrott near Tower 34720 to serve Dunlavy transformer TR3 load. Create Ckt.90A Kirby tap to DN-TR3 tap to Garrott. ERCOT project 73578G |
CNP Tier 4 |
In-Service Completed tab |
138 | May 2025 actual 2025-05 |
Kirby to Garrott Harris County |
Kirby, Garrott |
| Upgrade to increase thermal limits as part of FRM upgrades Upgrade Hyde Park to Downtown Ckt.32A to increase thermal limits as part of FRM upgrades ERCOT project 87479I |
CNP Tier 4 |
Conceptual Current-year planned tab |
138 | Jul 2025 | Kirby to Garrott Harris County |
Kirby, Garrott |
| Facility Ratings Methodology (FRM) Upgrades Upgrade Kirby to Garrott Ckt.37A to increase thermal limits as part of FRM upgrades ERCOT project 90232H |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Oct 2026 | Kirby to Garrott Harris County |
Kirby, Garrott |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 87479I | Status as reported | Planned → Conceptual |
| July 13, 2026 | 90232H | Projected in-service date | Jul 2026 → Oct 2026 |
| June 1, 2026 | 73578G | Status as reported | Planned → In-Service |
| February 1, 2026 | 90232H | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 73578G | Moved between tabs | Future → Completed |
| June 1, 2025 | 87479I | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 90232H | Projected in-service date | Jul 2025 → Jul 2026 |
| February 1, 2025 | 90232H | First listed | on the Future tab |
| October 1, 2024 | 73578G | First listed | on the Future tab |
| October 1, 2024 | 87479I | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.