Substation Scout

Peters

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Fort Bend County. First named in the release with data as of February 1, 2015.

Fort Bendcounty as printed
138kV
CNPutility
3projects listed

Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand Peters 138kV Substation” — project 102542, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Fort Bend, TX: ERCOT queue, 10 active of 14. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Expand Peters 138kV Substation from ring bus to Breaker-and-Half configuration. Connect two circuits from Peters to TRENCH (TRE) customer owned substation
ERCOT project 102542
CNP
Tier 4
Planned
Future tab
138 May 2027 Peters to TRENCK
Fort Bend County
Peters, TRENCK
Install (2) 14.4 MVAR distribution cap banks at Twinwood substation. Install (2) 14.4 MVAR distribution cap banks at Fulshear substation. Install (2) 40 MVAR transmission cap bank at Peters substation.
Install (1) 40 MVAR transmission cap bank at Peters substation. (first of two)
ERCOT project 99000B
CNP
Tier 4
Planned
Future tab
138 May 2028 Peters
Fort Bend County
Peters
Install (2) 14.4 MVAR distribution cap banks at Twinwood substation. Install (2) 14.4 MVAR distribution cap banks at Fulshear substation. Install (2) 40 MVAR transmission cap bank at Peters substation.
Install (1) additional 40 MVAR switchable transmission cap bank at Peters substation. (second of two)
ERCOT project 99000C
CNP
Tier 4
Planned
Future tab
138 May 2029 Peters
Fort Bend County
Peters

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
February 1, 2026102542First listedon the Future tab
October 1, 202599000BFirst listedon the Future tab
October 1, 202599000CFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first