Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Fort Bend County, plus 1 on its Cancelled tab. First named in the release with data as of February 1, 2022.

Fort Bendcounty as printed
138kV
CNPutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Fort Bend, TX: ERCOT queue, 10 active of 14. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Twinwood (TWN) 138kV CEHE Substation RHEMAN (RHE) / Twinwood Solar (26INR0425) and Maderagemela BESS (26INR0426)
Install new Twinwood (TWN) 138kV Substation for generator interconnection to RHEMAN (RHE) / Twinwood Solar (26INR0425) and Maderagemela BESS (26INR0426). Loop into existing Ckt.25E to create new Ckt.25 Fulshear to Twinwood (new) to Twinwood (distribution loop) to Peters.
ERCOT project 102774A
CNP
Tier 4
Planned
Future tab
138 Nov 2028 Twinwood (new) to Fulshear/Twinwood
Fort Bend County
Twinwood (new), Fulshear, Twinwood
Install (2) 14.4 MVAR distribution cap banks at Twinwood substation. Install (2) 14.4 MVAR distribution cap banks at Fulshear substation. Install (2) 40 MVAR transmission cap bank at Peters substation.
Install (2) 14.4 MVAR distribution cap banks at Fulshear substation.
ERCOT project 99000A
CNP
Tier 4
Planned
Future tab
138 Jan 2027 Fulshear
Fort Bend County
Fulshear

On the Cancelled tab

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Install 30MVAR cap bank at Fulshear distribution substation.
ERCOT project 99004
CNP
Tier 4
Conceptual
Cancelled tab
138 May 2026 Fulshear
Fort Bend County
Fulshear

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
June 1, 202699004Moved between tabsCurrent-year planned → Cancelled
June 1, 202699004Status as reportedPlanned → Conceptual
February 1, 2026102774AFirst listedon the Future tab
February 1, 202699004Moved between tabsFuture → Current-year planned
October 1, 202599000AFirst listedon the Future tab
October 1, 202599004First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first