New Barksdale
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Edwards County. First named in the release with data as of October 1, 2020.
Edwardscounty as printed
69kV
AEP TCC, AEP TCC/ETTutility
2projects listed
No HIFLD substation record has this name in this county.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| New Barksdale to Rocksprings: Rebuild 69 kV Line Rebuild the Campwood to Rocksprings 69 kV line ERCOT project 55605 · utility no. 3819 · RPG 24RPG009 |
AEP TCC Tier 4 |
Planned Future tab |
69 | Oct 2029 | New Barksdale to Rocksprings Edwards County |
New Barksdale, Rocksprings |
| Campwood to New Barksdale: Rebuild 69 kV Line Rebuild the Campwood to Rocksprings 69 kV line ERCOT project 55617 · utility no. 3820 · RPG 24RPG009 |
AEP TCC/ETT Tier 4 |
Planned Future tab |
69 | Oct 2029 | Campwood to New Barksdale Edwards County |
Campwood, New Barksdale |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 55605 | Projected in-service date | Nov 2028 → Oct 2029 |
| June 1, 2026 | 55617 | Projected in-service date | Nov 2028 → Oct 2029 |
| October 1, 2024 | 55605 | Projected in-service date | Aug 2028 → Nov 2028 |
| October 1, 2024 | 55617 | Projected in-service date | Aug 2028 → Nov 2028 |
| June 1, 2024 | 55605 | Projected in-service date | Jan 2026 → Aug 2028 |
| June 1, 2024 | 55617 | Projected in-service date | Jan 2026 → Aug 2028 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.