Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Ector County. First named in the release with data as of October 1, 2022.
Ectorcounty as printed
138, 345kV
ONCORutility
4projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Ector, TX: ERCOT queue, 21 active of 25 · SPP queue, 0 active of 6. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Reiter - Tesoro 345 kV Double-Circuit Line Construct new 2.5-mile 345 kV double-circuit line from Tesoro to Reiter ERCOT project 71187 · utility no. R8629 · RPG 23RPG029 |
ONCOR Tier 1 |
Planned Current-year planned tab |
345 | Dec 2026 | Tesoro to Reiter Midland / Ector County |
Tesoro, Reiter |
| Salt Flat Road 138 kV Switch and Salt Flat Road - Barr Ranch - Reiter 138 kV Second Circuit Add Salt Flat Road 138 kV Switch and Salt Flat Road - Barr Ranch - Reiter 138 kV Second Circuit & De-energize auto at Odessa EHV ERCOT project 81175 · utility no. R8704 · RPG 25RPG007 |
ONCOR Tier 3 |
Planned Completed tab |
138 | Dec 2025 actual 2025-12 |
Reiter to Salt Flat Road Ector / Midland County |
Reiter, Salt Flat Road |
| Reiter to Yarbrough 138 kV Line Rebuild Rebuild the existing138 kV line from Reiter to Yarbrough ERCOT project 81418 · utility no. R8527 · RPG 25RPG008 |
ONCOR Tier 3 |
Planned Current-year planned tab |
138 | Dec 2026 | Reiter to Yarbrough Ector / Crane County |
Reiter, Yarbrough |
| Rebuild Odessa EHV - Reiter 138 kV Double Circuit Line Add Permian Basin Reliability Plan Upgrade ID L17 Upgrade Odessa - Reiter 138kV double-circuit line ERCOT project 93466 · utility no. PB L17 |
ONCOR Tier 3 |
Planned Future tab |
138 | Dec 2027 | Odessa EHV to Reiter Ector County |
Odessa EHV, Reiter |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2026 | 71187 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 81175 | Moved between tabs | Current-year planned → Completed |
| February 1, 2026 | 81418 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 71187 | Projected in-service date | May 2027 → Dec 2026 |
| October 1, 2025 | 81418 | Projected in-service date | Dec 2027 → Dec 2026 |
| June 1, 2025 | 81175 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 93466 | First listed | on the Future tab |
| February 1, 2025 | 81418 | Projected in-service date | Dec 2026 → Dec 2027 |
| June 1, 2024 | 71187 | Projected in-service date | Dec 2026 → May 2027 |
| June 1, 2024 | 81175 | First listed | on the Future tab |
| June 1, 2024 | 81418 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner