Ector, TX interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 6 with terminal status (shown grayed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2010-060 Not reported 345 992 Gas Withdrawn
GEN-2008-135 Not reported n/r 531 Gas Withdrawn
GEN-2008-136 Not reported n/r 531 Gas Withdrawn
GEN-2010-059 Not reported 345 516 Gas Withdrawn
GEN-2001-008 Not reported n/r 500 Gas Withdrawn
GEN-2011-031 Not reported 230 195.6 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.