Named in 0 listed projects in ERCOT’s transmission project tracking workbook, in Duval County, plus 1 on its Cancelled tab. First named in the release with data as of February 1, 2015.
Projects cancelled. Every project naming Freer is on the Cancelled tab of ERCOT's workbook.
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Duval, TX: ERCOT queue, 14 active of 18. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Lobo to Freer: Rebuild 69 kV line Rebuild Lobo to Freer 69 kV line with 795 ACSS ERCOT project 3901 · utility no. 2596 · RTP 2013-R90 |
AEP Tier 3 |
Planned Cancelled tab |
69 | Jan 2025 | Lobo to Freer Webb / Duval County |
Lobo, Freer |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2025 | 3901 | Projected in-service date | Jun 2024 → Jan 2025 |
| October 1, 2024 | 3901 | First listed | on the Cancelled tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.