Bergheim

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Comal County. First named in the release with data as of February 1, 2015.

Comalcounty as printed
345kV
LCRATSCutility
3projects listed

A HIFLD substation record has the same name and county: BERGHEIM (COMAL County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Comal, TX: ERCOT queue, 2 active of 4. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Antler - Bergheim Transmission Line Upgrade
This project will increase the reliability and capacity of transmission facilities on the T493 Antler to Bergheim 138-kV and T389 Bergheim to Hays Energy 345-kV 7.2-mile double-circuit transmission line by replacing the aging conductors from Antler to Bergheim substations.
ERCOT project 61234 · RPG 22RPG005
LCRATSC
Tier 3
Planned
Completed tab
345 Apr 2025
actual 2025-02
Antler to Bergheim
Comal County
Antler, Bergheim
Bergheim - Fair Oaks Transmission Line Upgrade
This project will Increase the reliability of transmission facilities on the T238 Bergheim to Fair Oaks 138-kV and T656 Bergheim to Kendall 345-kV 4.1-mile double-circuit transmission line by replacing the aging conductor.
ERCOT project 61392 · RPG 22RPG005
LCRATSC
Tier 4
Planned
Completed tab
345 Mar 2025
actual 2025-03
Bergheim to Fair Oaks Ranch/Kendall
Comal / Kendall County
Bergheim, Fair Oaks Ranch, Kendall
Bergheim_Autotransformer_Upgrade
To improve efficiency and reliability of the transmission system, LCRA TSC will replace the existing Bergheim AT1 autotransformer with a higher capacity unit and install a second autotransformer at Bergheim Substation.
ERCOT project 91392 · utility no. PLC-7662 · RPG 24RPG038
LCRATSC
Tier 3
Planned
Future tab
345 May 2028 Bergheim
Comal County
Bergheim

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 202691392Projected in-service dateDec 2027 → May 2028
June 1, 202561234Moved between tabsFuture → Completed
June 1, 202561392Moved between tabsFuture → Completed
June 1, 202591392First listedon the Future tab
February 1, 202561392Projected in-service dateMay 2025 → Mar 2025
October 1, 202461392Projected in-service dateJul 2025 → May 2025
June 1, 202461234Projected in-service dateSep 2024 → Apr 2025
June 1, 202461392Projected in-service dateNov 2024 → Jul 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.