Substation Scout

Lockhart

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Caldwell County. First named in the release with data as of February 1, 2015.

Caldwellcounty as printed
69, 138kV
LCRATSCutility
3projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Caldwell, TX: ERCOT queue, 16 active of 17. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Dale to Lockhart Transmission line overhaul
Perform an overhaul and voltage conversion on T125 Dale - Lockhart transmission line from Dale Substation to Lockhart Substation.
ERCOT project 104557
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 Lockhart to Dale
Caldwell County
Lockhart, Dale
Lockhart - Luling 69-kV Transmission Line Overhaul
LCRA TSC will perform an overhaul on the 15.8-mile Lockhart – Luling (T157) 69-kV transmission line. This project will increase reliability of the structures and conductor by ensuring that the transmission line meets or exceeds current NESC and LCRA TSC design standards.
ERCOT project 72882 · RPG 23RPG004
LCRATSC
Tier 4
Planned
Completed tab
69 Jul 2025
actual 2025-06
Lockhart to Luling
Caldwell County
Lockhart, Luling
Lockhart - San Marcos Transmission Line Conversion
The five LCRA TSC-owned transmission line sections from Lockhart to San Marcos will be converted to 138-kV (T220 San Marcos to Camp Gary to Robert Brown Jr., T519 Robert Brown Jr. to Clear Fork, and T601 Clear Fork to Lockhart).
ERCOT project 73106 · RTP 2023-SC11
LCRATSC
Tier 4
Planned
Completed tab
138 May 2026
actual 2026-05
Lockhart to San Marcos
Caldwell / Hays County
Lockhart, San Marcos

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 202673106Moved between tabsCurrent-year planned → Completed
June 1, 2026104557First listedon the Future tab
February 1, 202673106Moved between tabsFuture → Current-year planned
October 1, 202572882Moved between tabsCurrent-year planned → Completed
June 1, 202572882Moved between tabsFuture → Current-year planned
February 1, 202572882Projected in-service dateApr 2025 → Jul 2025
October 1, 202472882Projected in-service dateJun 2025 → Apr 2025
June 1, 202473106Projected in-service dateSep 2026 → May 2026

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.