Lockhart
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Caldwell County. First named in the release with data as of February 1, 2015.
Caldwellcounty as printed
69, 138kV
LCRATSCutility
3projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Caldwell, TX: ERCOT queue, 16 active of 17. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Dale to Lockhart Transmission line overhaul Perform an overhaul and voltage conversion on T125 Dale - Lockhart transmission line from Dale Substation to Lockhart Substation. ERCOT project 104557 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2028 | Lockhart to Dale Caldwell County |
Lockhart, Dale |
| Lockhart - Luling 69-kV Transmission Line Overhaul LCRA TSC will perform an overhaul on the 15.8-mile Lockhart – Luling (T157) 69-kV transmission line. This project will increase reliability of the structures and conductor by ensuring that the transmission line meets or exceeds current NESC and LCRA TSC design standards. ERCOT project 72882 · RPG 23RPG004 |
LCRATSC Tier 4 |
Planned Completed tab |
69 | Jul 2025 actual 2025-06 |
Lockhart to Luling Caldwell County |
Lockhart, Luling |
| Lockhart - San Marcos Transmission Line Conversion The five LCRA TSC-owned transmission line sections from Lockhart to San Marcos will be converted to 138-kV (T220 San Marcos to Camp Gary to Robert Brown Jr., T519 Robert Brown Jr. to Clear Fork, and T601 Clear Fork to Lockhart). ERCOT project 73106 · RTP 2023-SC11 |
LCRATSC Tier 4 |
Planned Completed tab |
138 | May 2026 actual 2026-05 |
Lockhart to San Marcos Caldwell / Hays County |
Lockhart, San Marcos |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 73106 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 104557 | First listed | on the Future tab |
| February 1, 2026 | 73106 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 72882 | Moved between tabs | Current-year planned → Completed |
| June 1, 2025 | 72882 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 72882 | Projected in-service date | Apr 2025 → Jul 2025 |
| October 1, 2024 | 72882 | Projected in-service date | Jun 2025 → Apr 2025 |
| June 1, 2024 | 73106 | Projected in-service date | Sep 2026 → May 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.