TNP One
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Robertson County. First named in the release with data as of October 1, 2025.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand the TNP One Substation” — project 99103, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Robertson, TX: ERCOT queue, 18 active of 20. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Rebuild the TNP One - Herndon/Gibson 345 kV DCKT Line ERCOT project 110032 · utility no. R6540 |
ONCOR Tier 3 |
Planned Future tab |
345 | Dec 2030 | Herndon/Gibson to TNP One Milam / Robertson County |
Herndon, Gibson, TNP One |
| BRYN_99103_RELLIS_TNPONE_DC345KV Expand the existing RELLIS 138 kV Substation to establish the BTU RELLIS 345/138 kV Switchyard. Install at RELLIS Switchyard two 345/138 kV autotransformers with a nameplate rating of 600 MVA. Expand the TNP One Substation to accommodate two additional 345 kV line terminals. Construct a 40-mile, 345 kV double-circuit line from BTU RELLIS to TNMP TNP One. ERCOT project 99103 · RPG 25RPG001 |
BRYN/BTU AND TNMP Tier 1 |
Planned Future tab |
345 | Oct 2029 | RELLIS to TNP One Brazos / Robertson County |
RELLIS, TNP One |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110032 | First listed | on the Future tab |
| October 1, 2025 | 99103 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.