Brazos, TX interconnection queue

1 active project totalling 104.4 MW in the ERCOT queue.

1active projects
104.4active MW
1total filed
Queue IDProjectkVMWResourceStatus
25INR0347 Cadet Storage 69 104.4 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.