Needville

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of February 1, 2024.

Brazoriacounty as printed
138kV
CNPutility
3projects listed

Expansion at an existing substation: new voltage level. The quoted wording describes a yard, bus or conversion at a voltage this substation is not otherwise shown at. “Convert existing Needville 138/12kV distribution substation to 138/35kV” — project 109640, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Convert existing Needville 138/12kV distribution substation to 138/35kV. Remove existing Big Creek 138/12kV distribution substation to create new Ckt.89B Needville to Pleak.
ERCOT project 109640
CNP
Tier 4
Planned
Future tab
138 May 2028 Needville to Pleak
Brazoria County
Needville, Pleak
West Columbia to Damon and Needville to Big Creek Ckt.89A Upgrades
Rebuild/reconductor Needville to Big Creek Ckt.89 as a Hardening upgrade.
ERCOT project 78461B · RPG 23RPG021
CNP
Tier 4
Planned
Future tab
138 Jan 2027 Needville to Big Creek
Brazoria County
Needville, Big Creek
Rebuild/reconductor Ckt.89A West Columbia to Damon and Ckt.89A Damon to Needville to increase thermal limits. Upgrade Ckt.89A West Columbia equipment to increase thermal limits.
Rebuild/reconductor Ckt.89A West Columbia to Damon (3.74 miles) and Ckt.89A Damon to Needville (10.1 miles) to increase thermal limits. Upgrade Ckt.89A West Columbia equipment to increase thermal limits.
ERCOT project 98997 · RPG 25RPG011
CNP
Tier 3
Planned
Future tab
138 May 2028 West Columbia to Needville
Brazoria County
West Columbia, Needville

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109640First listedon the Future tab
July 13, 202678461BMoved between tabsCurrent-year planned → Future
July 13, 202678461BProjected in-service dateDec 2026 → Jan 2027
February 1, 202678461BMoved between tabsFuture → Current-year planned
October 1, 202598997First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.