Burke
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Brazoria County. First named in the release with data as of February 1, 2023.
Brazoriacounty as printed
138kV
CNPutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Brazoria, TX: ERCOT queue, 54 active of 63. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Install new 138kV AERIE (AER) customer substation. Loop on Ckt.02B to create new Ckt.02 Nash to AERIE to Burke. ERCOT project 102996 |
CNP Tier 4 |
Planned Future tab |
138 | Dec 2027 | AERIE to Nash / Burke Brazoria County |
AERIE, Nash, Burke |
| Weinbrenner (WEI) 138kV CEHE Station for LONGPO (LNP) / Long Point Solar 19INR0042 Loop new CEHE 138kV substation Weinbrenner (WEI) into Ckt.02J Burke to Eagle Nest to create new Ckt.02 Burke to Weinbrenner to Eagle Nest. ERCOT project 78480A |
CNP Tier 4 |
In-Service Completed tab |
138 | Nov 2025 actual 2025-12 |
Weinbrenner to Burke/ Eagle Nest Brazoria County |
Weinbrenner, Burke, Eagle Nest |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 102996 | First listed | on the Future tab |
| February 1, 2026 | 78480A | Moved between tabs | Current-year planned → Completed |
| February 1, 2026 | 78480A | Status as reported | Planned → In-Service |
| October 1, 2025 | 78480A | Projected in-service date | Oct 2025 → Nov 2025 |
| June 1, 2025 | 78480A | Moved between tabs | Future → Current-year planned |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.