Farmland

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Lynn County. First named in the release with data as of February 1, 2020.

Lynncounty as printed
345kV
ONCORutility
1projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Lynn, TX: ERCOT queue, 0 active of 1 · SPP queue, 1 active of 4. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Farmland 345 kV Switch Rebuild and Farmland - Long Draw 345 kV Line
Rebuild the existing 22.8-mile Farmland - Long Draw 345 kV Line and terminate the circuit into the newly rebuilt Farmland 345 kV Switch and WETT's existing Long Draw 345 kV Switch
ERCOT project 110521 · utility no. R8786
ONCOR
Tier 3
Conceptual
Future tab
345 Dec 2029 Farmland to Long Draw
Lynn / Borden County
Farmland, Long Draw

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110521First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.