Big Sandy
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Bastrop County. First named in the release with data as of July 13, 2026.
Bastropcounty as printed
138kV
LCRATSCutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Bastrop, TX: ERCOT queue, 14 active of 16. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Big Sandy Circuit Breaker Addition Provide transformation by installing circuit breakers for 138-kV bus terminations on the transmission bus at Big Sandy Substation ERCOT project 109751 |
LCRATSC Tier 4 |
Planned Future tab |
138 | Jun 2028 | Big Sandy Bastrop County |
Big Sandy |
| Utley Substation and Transmission Line Addition Upgrade L_BIGSAN8_1Y (Bus #7316) - L_UTLEY_8_1Y (Bus #7317) 138.0-kV line as an LCP project for Batch Zero Base Load ERCOT project 109866 |
LCRATSC Tier 4 |
Conceptual Future tab |
138 | Dec 2030 | Big Sandy to Utley Bastrop County |
Big Sandy, Utley |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109751 | First listed | on the Future tab |
| July 13, 2026 | 109866 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.