West Plant

In the Salt River Project ten-year transmission plan filed with the Arizona Corporation Commission.

—county (not printed)
230kV as printed
SRPutility plan
TBDin service, as printed

Described as new. The quoted wording calls this substation new. “New 230 kV Switchyard near the existing Goldfield - Silver King 230 kV line, tentatively named "West Plant Switchyard"” — SRP 2026-2035 Ten Year Plan, p.29

Also mentioned: “the existing Goldfield - Silver King 230 kV Transmission Line will loop into the West Plant 230 kV Switchyard.” — SRP 2026-2035 Ten Year Plan, p.29

Note. The plan says the name is tentative and the location is not determined ("Near SEC34, T1S, R12E (exact location not determined)").

Note. Purpose as printed: "This is a single customer requested and driven project and is not triggered by system load growth." SRP does not yet hold a CEC for it.

No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.

Location

Pinal County, AZ

County of the area the plan places it in. No source prints a location. The plan places the substation relative to a mapped feature, and everywhere within that range is in one county. No point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. The plan says the site is "still being determined"; no CEC exists. Not in OSM or HIFLD by name.

County: the plan prints “Near SEC34, T1S, R12E (exact location not determined)”. That section and all eight sections around it lie wholly in Pinal County (BLM PLSS; Census TIGERweb).

Sources: SRP 2026-2035 Ten-Year Transmission Plan (Salt River Project Agricultural Improvement and Power District), ACC Docket E-99999A-25-0006 (A.R.S. 40-360.02 ten-year plans) (filed 2026-01-29), p.29 · BLM PLSS CadNSDI section polygons (Sec 34, T1S, R12E and its eight neighbours), counties intersecting each section from Census TIGERweb State_County (n/a (queried 2026-11-20)), layer 2. Researched by Substation Scout; checked November 21, 2026.

The project in the plan

ProjectWhere in the planLine siting case
Silver King - East Plant - West Plant 230 kV (TBD)p.29Not printed

Generation interconnection requests filed in Pinal, AZ: APS queue, 27 active of 80. Same county, not the same substation.

Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.

Before relying on any of this