In the Arizona Electric Power Cooperative ten-year transmission plan filed with the Arizona Corporation Commission.

—county (not printed)
115kV as printed
AEPCOutility plan
June 2027in service, as printed

Described as new. The quoted wording calls this substation new. “a new 1 15 kV switching station called Redington, to be built adjacent to the existing APS San Manuel Substation. (June 2027)” — Arizona G&T Cooperatives 2026-2035 Ten Year Plan, p.8

Also mentioned: “a new 115 kV switching station to be build adjacent to the existing APS San Manuel Substation. (June 2027)” — Arizona G&T Cooperatives 2026-2035 Ten Year Plan, p.42

Note. The plan says the project was "referred to in prior plans as the San Manuel Interconnection Project".

Note. The 2009 SWTC CEC docket for the San Manuel interconnect project (L-00000CC-09-0158-00142) says "in the vicinity of San Manuel in Pinal County" but does not print the Redington name, so no county is given.

No county is printed for this substation in the plan or in a Line Siting Committee docket found for it.

Location

Pinal County, AZ

County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. The plan says "adjacent to the existing APS San Manuel Substation" (OSM/HIFLD San Manuel 32.6186 N, 110.6259 W); adjacency to a neighbour is not a point. The 2009 filing says "Two locations are currently being considered for the switchyard" on the former BHP plant site, both "near an existing substation"; neither is chosen in any later source found.

Note: The 2009 CEC certified a 4.5-mile double-circuit 230 kV line (energized at 115 kV) to the APS San Manuel Substation and SWTC then described the Redington switchyard as a future step ("As the need for future load increases, SWTC will eventually construct a new substation, the Redington Substation"); the 2026 plan builds Redington with the line in June 2027. Plan p.42 omits the name ("a new 115 kV switching station").

Sources: Arizona G&T Cooperatives 2026-2035 Ten Year Transmission Plan (Arizona Electric Power Cooperative, Inc.), ACC Docket E-99999A-25-0006 (filed 2026-01-30), p.8 · Southwest Transmission Cooperative application, ACC Line Siting Case No. 142 (Docket L-00000CC-09-0158-00142), San Manuel interconnect project, with Environmental Assessment and Biological Assessment "Redington Interconnect Project" (filed 2009-03-27), EA p.58 · ACC Line Siting Case No. 142, Certificate of Environmental Compatibility (SWTC San Manuel interconnect project, "in the vicinity of San Manuel in Pinal County") (docketed 2009-05-27 (Decision No. 71218)), caption p.1; p.4 · OpenStreetMap: San Manuel Substation and power features near San Manuel (OSM base 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

The project in the plan

ProjectWhere in the planLine siting case
Apache/Hayden to San Manuel 115 kV Linep.8Not printed

Generation interconnection requests filed in Pinal, AZ: APS queue, 27 active of 80. Same county, not the same substation.

Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.