Bianco

In the Arizona Public Service ten-year transmission plan filed with the Arizona Corporation Commission, in Pinal County.

Pinalcounty
230, 69kV as printed
APSutility plan
2028in service, as printed

Described as new. The quoted wording calls this substation proposed or future. “The future Bianco substation, located east of Bianco Road and between Clayton Road and SR 84 in Casa Grande” — APS 2026-2035 Ten Year Transmission Plan, p.31

Also mentioned: “The projected overloads will be resolved through the addition of Bianco substation.” — APS 2026-2035 Ten Year Transmission Plan, p.31 · “Bianco 230/69kV Transformer Additions (2 units)” — APS 2026-2035 Ten Year Transmission Plan, p.10

Note. The plan gives the purpose as "To support continued load growth in Pinal County, including new manufacturing and industrial customers in the Casa Grande area."

Note. The plan says CEC 257 was pending Commission action. The ACC docket lists Decision No. 81681 (Certificate of Environmental Compatibility) on 2026-03-24, after the plan was filed.

County: “ORIGINATING AT THE PLANNED BIANCO SUBSTATION AND TERMINATING AT POINTS ALONG THE EXISTING APS SANTA ROSA TO DESERT BASIN LINE, ALL WITHIN PINAL COUNTY, ARIZONA.” — ACC Line Siting Case No. 257 (docket L-00000D-25-0258-00257), Certificate of Environmental Compatibility filed by the Siting Committee chairman, docketed 2026-02-05, caption on p.1, retrieved 2026-11-20.

Location

32.8886, -111.8218 · Pinal County, AZ · view on a map

Parcel or address in a filing. A filing names the parcel or address; the point is its center. Accurate to about ±450 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Centroid of the substation property as the CEC prints its four edges (Exhibit A, Corridor Description): "The northern edge of the substation is the Casa Grande Canal alignment which is 0.25 mile south of Clayton Road. The eastern edge of the substation is 0.5 mile east of Bianco Road. The southern edge is a farm road that is 0.5 mile south of Clayton Road", with the west side on Bianco Road (the corridor's 500-foot strip on the west side lies "only within the substation property"). Edges laid on OpenStreetMap: N Bianco Rd x W Clayton Rd at 32.89410, -111.82614; the canal alignment at 32.8904 (OSM Casa Grande Canal runs at 32.8903-32.8904 just east); box 32.8868-32.8904 N, 111.8261-111.8175 W (about 805 m x 400 m). ±450 m is the half-diagonal of that property: the yard's place inside it is not printed.

Sources: APS 2026-2035 Ten Year Transmission Plan (Arizona Public Service Company), ACC Docket E-99999A-25-0006 (A.R.S. 40-360.02 ten-year plans) (filed 2026-01-30), p.31 · ACC Line Siting Case No. 257 (Docket L-00000D-25-0258-00257), Certificate of Environmental Compatibility, Bianco 230kV Transmission Line Project, with Exhibit A corridor description (docketed 2026-02-05 (Commission Decision No. 81681…), caption p.1; Project Description p.3; Exhibit A Corridor Description p.14 · OpenStreetMap: Bianco Road, Clayton Road, Casa Grande Canal near Casa Grande (OSM base 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

The project in the plan

ProjectWhere in the planLine siting case
Bianco 230kV Linesp.31CEC 257

Generation interconnection requests filed in Pinal, AZ: APS queue, 27 active of 80. Same county, not the same substation.

Source: the utilities’ ten-year transmission plans filed with the Arizona Corporation Commission under A.R.S. 40-360.02, docket E-99999A-25-0006: APS 2026-2035 Ten Year Transmission Plan (filed January 30, 2026); TEP 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); UNS Electric 2026-2035 Ten-Year Transmission Plan (filed January 30, 2026); SRP 2026-2035 Ten Year Plan (filed January 29, 2026); SRP supplement to the 2026-2035 Ten Year Plan (filed August 13, 2026); Arizona G&T Cooperatives 2026-2035 Ten Year Plan (filed January 30, 2026). Retrieved 2026-11-20; records reviewed by hand 2026-11-20.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first