SPP request GEN-2026-PR3

SPP queue ID GEN-2026-PR3

Queue request GEN-2026-PR3 was listed in the SPP interconnection queue at the end of 2025 as a 49.7 MW wind project in Garfield County, OK, according to Berkeley Lab’s queue data file. The filing names Otter as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2030.

Queue IDGEN-2026-PR3
Project nameNot reported
Status (as published)Active
SubstationOtter
Point of interconnectionOtter 138kV
CountyGarfield
StateOK
Voltage138 kV
Capacity49.7 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2030-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Otter substation: 2 requests in the SPP queue, 2 active totaling 298.1 MW.

Queue IDProjectMWResourceStatus
GEN-2014-064Not reported248.4WindOperational

Garfield, OK: 18 requests in the SPP queue, 11 active totaling 1,774.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterPriority Process; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)None
Queue date2025-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.