Substation Scout

Garfield, OK interconnection queue

11 active projects totaling 1,774.1 MW in the SPP queue, plus 7 with terminal status (shown grayed).

11active projects
1,774.1active MW
18total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-013 Not reported 345 300 Wind Operational
GEN-2008-042 Not reported n/r 300 Wind Withdrawn
GEN-2016-061 Not reported 345 250.7 Wind Operational
GEN-2016-068 Not reported 345 250 Wind Operational
GEN-2017-164 Not reported 345 250 Solar Active
GEN-2014-064 Not reported 138 248.4 Wind Operational
GEN-2008-126 Not reported n/r 240 Wind Withdrawn
GEN-2020-023 Not reported 345 202 Battery Withdrawn
GEN-2024-SR11 Not reported 345 200 Battery Active
GEN-2024-190 Not reported 345 199 Battery Withdrawn
GEN-2008-043 Not reported n/r 150 Wind Withdrawn
GEN-2008-113 Not reported n/r 100 Wind Withdrawn
GEN-2008-114 Not reported n/r 100 Wind Withdrawn
GEN-2012-033 Not reported 138 98.8 Wind Operational
GEN-2023-SR13 Not reported 138 70 Battery Operational
GEN-2017-178 Not reported 345 52 Battery Active
GEN-2026-PR3 Not reported 138 49.7 Wind Active
GEN-2015-062 Not reported 138 4.5 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first