Otter substation interconnection queue

2 active projects totaling 298.1 MW in the SPP queue.

2 SPP queue filings name Otter as the point of interconnection, all in Garfield County, OK.

2active projects
298.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2014-064 Not reported 138 248.4 Wind Operational
GEN-2026-PR3 Not reported 138 49.7 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.