Queue request GEN-2024-286 was listed in the SPP interconnection queue at the end of 2025 as a 136 MW gas project in Le Flore County, OK, according to Berkeley Lab’s queue data file. The filing names AES 5 Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2031.

Queue IDGEN-2024-286
Project nameNot reported
Status (as published)Active
SubstationAES 5 Substation
Point of interconnectionAES 5 161 kV Substation
CountyLe Flore
StateOK
Voltage161 kV
Capacity136 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2031-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

AES 5 Substation substation: 2 requests in the SPP queue, 2 active totaling 880 MW.

Queue IDProjectMWResourceStatus
GEN-2024-299Not reported744GasActive

Le Flore, OK: 6 requests in the SPP queue, 3 active totaling 436 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first