AES 5 Substation substation interconnection queue

2 active projects totaling 880 MW in the SPP queue.

2 SPP queue filings name AES 5 Substation as the point of interconnection, all in OK.

2active projects
880active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-299 Not reported 345 744 Gas Active
GEN-2024-286 Not reported 161 136 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.