Le Flore, OK interconnection queue

3 active projects totaling 436 MW in the SPP queue, plus 3 with terminal status (shown grayed).

3active projects
436active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-030 Not reported n/r 660 Coal Withdrawn
GEN-2006-042 Not reported n/r 600 Coal Withdrawn
GEN-2023-064 Not reported 161 200 Hybrid Active
GEN-2024-286 Not reported 161 136 Gas Active
GEN-2016-028 Not reported 138 100 Wind Operational
GEN-2021-SR4 Not reported n/r 22.2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.