Le Flore, OK interconnection queue
3 active projects totaling 436 MW in the SPP queue, plus 3 with terminal status (shown grayed).
3active projects
436active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2008-030 | Not reported | n/r | 660 | Coal | Withdrawn |
| GEN-2006-042 | Not reported | n/r | 600 | Coal | Withdrawn |
| GEN-2023-064 | Not reported | 161 | 200 | Hybrid | Active |
| GEN-2024-286 | Not reported | 161 | 136 | Gas | Active |
| GEN-2016-028 | Not reported | 138 | 100 | Wind | Operational |
| GEN-2021-SR4 | Not reported | n/r | 22.2 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.