SPP request GEN-2024-241

SPP queue ID GEN-2024-241

Queue request GEN-2024-241 was listed in the SPP interconnection queue at the end of 2025 as a 100 MW solar project in Bowie County, TX, according to Berkeley Lab’s queue data file. The filing names Lydia Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2028.

Queue IDGEN-2024-241
Project nameNot reported
Status (as published)Active
SubstationLydia Substation
Point of interconnectionLydia 345 kV Substation
CountyBowie
StateTX
Voltage345 kV
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lydia Substation substation: 2 requests in the SPP queue, 2 active totaling 400 MW.

Queue IDProjectMWResourceStatus
GEN-2024-025Not reported300SolarActive

Bowie, TX: 12 requests in the SPP queue, 5 active totaling 900 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.