2 active projects totaling 400 MW in the SPP queue.

2 SPP queue filings name Lydia Substation as the point of interconnection, all in Bowie County, TX.

2active projects
400active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-025 Not reported 345 300 Solar Active
GEN-2024-241 Not reported 345 100 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.