SPP request GEN-2023-GR5

SPP queue ID GEN-2023-GR5

Queue request GEN-2023-GR5 was listed in the SPP interconnection queue at the end of 2025 as a 150 MW solar project in Lamb County, TX, according to Berkeley Lab’s queue data file. The filing names Plant X Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2026.

Queue IDGEN-2023-GR5
Project nameNot reported
Status (as published)Active
SubstationPlant X Substation
Point of interconnectionPlant X 115 kV Substation
CountyLamb
StateTX
Voltage115 kV
Capacity150 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Plant X Substation substation: 16 requests in the SPP queue, 2 active totaling 406 MW.

Queue IDProjectMWResourceStatus
GEN-2024-063Not reported256SolarActive
GEN-2017-217Not reported300SolarWithdrawn
GEN-2022-056Not reported300SolarWithdrawn
GEN-2023-176Not reported300WindWithdrawn
GEN-2023-142Not reported275SolarWithdrawn
GEN-2023-005Not reported256SolarWithdrawn
GEN-2023-060Not reported256SolarWithdrawn
GEN-2023-126Not reported250SolarWithdrawn
GEN-2023-127Not reported250SolarWithdrawn
GEN-2023-128Not reported250SolarWithdrawn
GEN-2023-129Not reported250SolarWithdrawn
GEN-2023-143Not reported200BatteryWithdrawn

3 more on the substation page.

Lamb, TX: 34 requests in the SPP queue, 3 active totaling 638.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityXcel/SPS
ClusterReplacement; 05 SOUTHWEST
Interconnection serviceERIS
Project typeReplacement
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2023-07-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first