Lamb, TX interconnection queue
3 active projects totaling 638.5 MW in the SPP queue, plus 31 with terminal status (shown grayed).
3active projects
638.5active MW
34total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2022-036 | Not reported | 345 | 1,000 | Solar | Withdrawn |
| GEN-2017-218 | Not reported | 230 | 600 | Solar | Withdrawn |
| GEN-2017-219 | Not reported | 230 | 600 | Solar | Withdrawn |
| GEN-2017-080 | Not reported | 230 | 525 | Solar | Withdrawn |
| GEN-2008-072 | Not reported | n/r | 300 | Wind | Withdrawn |
| GEN-2017-217 | Not reported | 230 | 300 | Solar | Withdrawn |
| GEN-2022-035 | Not reported | 345 | 300 | Wind | Withdrawn |
| GEN-2022-056 | Not reported | 230 | 300 | Solar | Withdrawn |
| GEN-2022-201 | Not reported | 230 | 300 | Wind | Withdrawn |
| GEN-2023-176 | Not reported | 230 | 300 | Wind | Withdrawn |
| GEN-2022-236 | Not reported | 230 | 299 | Solar | Withdrawn |
| GEN-2023-142 | Not reported | 230 | 275 | Solar | Withdrawn |
| GEN-2023-005 | Not reported | 230 | 256 | Solar | Withdrawn |
| GEN-2023-060 | Not reported | 230 | 256 | Solar | Withdrawn |
| GEN-2024-063 | Not reported | 230 | 256 | Solar | Active |
| GEN-2023-126 | Not reported | 230 | 250 | Solar | Withdrawn |
| GEN-2023-127 | Not reported | 230 | 250 | Solar | Withdrawn |
| GEN-2023-128 | Not reported | 230 | 250 | Solar | Withdrawn |
| GEN-2023-129 | Not reported | 230 | 250 | Solar | Withdrawn |
| GEN-2017-026 | Not reported | 230 | 235 | Wind | Withdrawn |
| ERAS-2025-016 | Not reported | 230 | 232.5 | Gas | Active |
| GEN-2022-087 | Not reported | 230 | 225 | Hybrid | Withdrawn |
| GEN-2009-054 | Not reported | n/r | 220 | Wind | Withdrawn |
| GEN-2023-143 | Not reported | 230 | 200 | Battery | Withdrawn |
| GEN-2024-106 | Not reported | 230 | 200 | Solar | Withdrawn |
| GEN-2024-149 | Not reported | 345 | 196.4 | Solar | Withdrawn |
| GEN-2018-081 | Not reported | 230 | 175 | Solar | Withdrawn |
| GEN-2023-GR5 | Not reported | 115 | 150 | Solar | Active |
| GEN-2008-085 | Not reported | n/r | 135 | Wind | Withdrawn |
| GEN-2022-151 | Not reported | 115 | 115 | Battery | Withdrawn |
| GEN-2019-074 | Not reported | 230 | 100 | Battery | Withdrawn |
| GEN-2024-148 | Not reported | 345 | 100 | Solar | Withdrawn |
| GEN-2020-017 | Not reported | 230 | 74.9 | Solar | Withdrawn |
| GEN-2017-091 | Not reported | 115 | 26.3 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.