Plant X Substation substation interconnection queue

2 active projects totaling 406 MW in the SPP queue, plus 14 with terminal status (shown grayed).

16 SPP queue filings name Plant X Substation as the point of interconnection, all in Lamb County, TX.

2active projects
406active MW
16total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-217 Not reported 230 300 Solar Withdrawn
GEN-2022-056 Not reported 230 300 Solar Withdrawn
GEN-2023-176 Not reported 230 300 Wind Withdrawn
GEN-2023-142 Not reported 230 275 Solar Withdrawn
GEN-2023-005 Not reported 230 256 Solar Withdrawn
GEN-2023-060 Not reported 230 256 Solar Withdrawn
GEN-2024-063 Not reported 230 256 Solar Active
GEN-2023-126 Not reported 230 250 Solar Withdrawn
GEN-2023-127 Not reported 230 250 Solar Withdrawn
GEN-2023-128 Not reported 230 250 Solar Withdrawn
GEN-2023-129 Not reported 230 250 Solar Withdrawn
GEN-2023-143 Not reported 230 200 Battery Withdrawn
GEN-2024-106 Not reported 230 200 Solar Withdrawn
GEN-2018-081 Not reported 230 175 Solar Withdrawn
GEN-2023-GR5 Not reported 115 150 Solar Active
GEN-2019-074 Not reported 230 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.