Plant X Substation substation interconnection queue
2 active projects totaling 406 MW in the SPP queue, plus 14 with terminal status (shown grayed).
16 SPP queue filings name Plant X Substation as the point of interconnection, all in Lamb County, TX.
2active projects
406active MW
16total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2017-217 | Not reported | 230 | 300 | Solar | Withdrawn |
| GEN-2022-056 | Not reported | 230 | 300 | Solar | Withdrawn |
| GEN-2023-176 | Not reported | 230 | 300 | Wind | Withdrawn |
| GEN-2023-142 | Not reported | 230 | 275 | Solar | Withdrawn |
| GEN-2023-005 | Not reported | 230 | 256 | Solar | Withdrawn |
| GEN-2023-060 | Not reported | 230 | 256 | Solar | Withdrawn |
| GEN-2024-063 | Not reported | 230 | 256 | Solar | Active |
| GEN-2023-126 | Not reported | 230 | 250 | Solar | Withdrawn |
| GEN-2023-127 | Not reported | 230 | 250 | Solar | Withdrawn |
| GEN-2023-128 | Not reported | 230 | 250 | Solar | Withdrawn |
| GEN-2023-129 | Not reported | 230 | 250 | Solar | Withdrawn |
| GEN-2023-143 | Not reported | 230 | 200 | Battery | Withdrawn |
| GEN-2024-106 | Not reported | 230 | 200 | Solar | Withdrawn |
| GEN-2018-081 | Not reported | 230 | 175 | Solar | Withdrawn |
| GEN-2023-GR5 | Not reported | 115 | 150 | Solar | Active |
| GEN-2019-074 | Not reported | 230 | 100 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.
Site Scanner