SPP request GEN-2023-GR3

SPP queue ID GEN-2023-GR3

Queue request GEN-2023-GR3 was listed in the SPP interconnection queue at the end of 2025 as a 80 MW wind project in Quay County, NM, according to Berkeley Lab’s queue data file. The filing names Norton as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue IDGEN-2023-GR3
Project nameNot reported
Status (as published)Operational
SubstationNorton
Point of interconnectionNorton 115 kV
CountyQuay
StateNM
Voltage115 kV
Capacity80 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Norton substation: 2 requests in the SPP queue, 1 active totaling 80 MW.

Queue IDProjectMWResourceStatus
GEN-2014-066Not reported30SolarWithdrawn

Quay, NM: 12 requests in the SPP queue, 3 active totaling 128 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityXcel/SPS
ClusterReplacement; 05 SOUTHWEST
Interconnection serviceNRIS/ERIS
Project typeReplacement
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2023-06-30
Operational date2024-12-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.