3 active projects totaling 128 MW in the SPP queue, plus 9 with terminal status (shown grayed).

3active projects
128active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-095 Not reported 115 850 Solar Withdrawn
GEN-2020-080 Not reported 345 200 Battery Withdrawn
GEN-2023-096 Not reported 115 150 Wind Withdrawn
GEN-2001-036 Not reported 115 80 Wind Withdrawn
GEN-2003-003 Not reported n/r 80 Wind Withdrawn
GEN-2023-GR3 Not reported 115 80 Wind Operational
GEN-2017-016 Not reported 115 33 Solar Withdrawn
GEN-2014-066 Not reported 115 30 Solar Withdrawn
GEN-2012-015 Not reported 34.5 26 Solar Withdrawn
GEN-2013-022 Not reported 115 25 Solar Operational
GEN-2011-046 Not reported 115 23 Gas Operational
GEN-2017-069 Not reported 115 1.8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first