SPP request GEN-2023-225
SPP queue ID GEN-2023-225
Queue request GEN-2023-225 was listed in the SPP interconnection queue at the end of 2025 as a 217 MW gas project in Lancaster County, NE, according to Berkeley Lab’s queue data file. The filing names Olive Creek Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2029.
| Queue ID | GEN-2023-225 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Olive Creek Substation |
| Point of interconnection | Olive Creek 345 kV Substation |
| County | Lancaster |
| State | NE |
| Voltage | 345 kV |
| Capacity | 217 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2029-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Olive Creek Substation substation: 6 requests in the SPP queue, 6 active totaling 1,789.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| GEN-2024-021 | Not reported | 540 | Gas | Active |
| GEN-2023-224 | Not reported | 478 | Gas | Active |
| GEN-2024-020 | Not reported | 390 | Gas | Active |
| GEN-2021-027 | Not reported | 102.1 | Solar | Active |
| GEN-2024-017 | Not reported | 62 | Gas | Active |
Lancaster, NE: 39 requests in the SPP queue, 22 active totaling 3,912.1 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | NPPD |
|---|---|
| Cluster | DISIS-2023-001; 02 NEBRASKA |
| Interconnection service | ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Facility Study |
| Study phase (as the queue printed it) | FACILITY STUDY STAGE |
| Queue date | 2023-10-02 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.