Substation Scout

SPP request GEN-2021-027

SPP queue ID GEN-2021-027

Queue request GEN-2021-027 was listed in the SPP interconnection queue at the end of 2025 as a 102.1 MW solar project in Lancaster County, NE, according to Berkeley Lab’s queue data file. The filing names Olive Creek Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2026.

Queue IDGEN-2021-027
Project nameNot reported
Status (as published)Active
SubstationOlive Creek Substation
Point of interconnectionOlive Creek 115 kV Substation
CountyLancaster
StateNE
Voltage115 kV
Capacity102.1 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Olive Creek Substation substation: 6 requests in the SPP queue, 6 active totaling 1,789.1 MW.

Queue IDProjectMWResourceStatus
GEN-2024-021Not reported540GasActive
GEN-2023-224Not reported478GasActive
GEN-2024-020Not reported390GasActive
GEN-2023-225Not reported217GasActive
GEN-2024-017Not reported62GasActive

Lancaster, NE: 39 requests in the SPP queue, 22 active totaling 3,912.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNPPD
ClusterDISIS-2021-001; 02 NEBRASKA
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2021-05-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first