SPP request GEN-2022-100

SPP queue ID GEN-2022-100

Queue request GEN-2022-100 was listed in the SPP interconnection queue at the end of 2025 as a 80 MW hybrid project in Cooper County, MO, according to Berkeley Lab’s queue data file. The filing names Overton - Sedalia East Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 28, 2028.

Queue IDGEN-2022-100
Project nameNot reported
Status (as published)Active
SubstationOverton - Sedalia East Substation
Point of interconnectionOverton - Sedalia East 161 kV Substation
CountyCooper
StateMO
Voltage161 kV
Capacity80 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-03-28
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Overton - Sedalia East Substation substation: 2 requests in the SPP queue, 1 active totaling 80 MW.

Queue IDProjectMWResourceStatus
GEN-2024-004Not reported20SolarWithdrawn

Cooper, MO: 7 requests in the SPP queue, 2 active totaling 200 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityKCPL
ClusterDISIS-2022-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-03-24
Components (hybrid)Solar 80 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.