Cooper, MO interconnection queue

2 active projects totaling 200 MW in the SPP queue, plus 5 with terminal status (shown grayed).

2active projects
200active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2001-031 Not reported n/r 596 Gas Withdrawn
GEN-2001-029 Not reported n/r 540 Gas Withdrawn
GEN-2001-032 Not reported n/r 528 Gas Withdrawn
GEN-2023-115 Not reported 161 300 Solar Withdrawn
GEN-2024-054 Not reported 161 120 Solar Active
GEN-2022-100 Not reported 161 80 Hybrid Active
GEN-2024-004 Not reported 161 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.