Substation Scout

Overton - Sedalia East Substation substation interconnection queue

1 active project totaling 80 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2 SPP queue filings name Overton - Sedalia East Substation as the point of interconnection, all in Cooper County, MO.

1active projects
80active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-100 Not reported 161 80 Hybrid Active
GEN-2024-004 Not reported 161 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.